Current Projects

Request email notification when page changes E-Notify

Commercial Projects              Residential Projects

You can also check our interactive Development Activity map on the Department's Maps page.


COMMERCIAL PROJECTS
Note:  All images shown on this page are conceptual and may not depict the final product.


Taco Bell Site Layout_pic2
Taco Bell
Status:  In process
Location:  East side of Airline, south of Milton Wilson; on outparcel in front of Shops at Arlington Village Center
Applicant/Owner:  Pacific Bells
Engineer/Designer: Pickering Firm

Site Plan for a freestanding, roughly 2,050sf drive-through restaurant on a 1-acre outparcel in the Shops at Arlington Village shopping center. 

Approvals:
Approved by PC on 04/19/2021
DRC tentatively to consider on 05/11/2021

Prov Place Overview
Providence Place - Mixed Use PD

StatusIn Process
Location:  South side of Milton Wilson, east of the Shops of Arlington Village PD and Hall Creek
Applicant/Owner: Bank of Bartlett
Engineer/Designer: Dalhoff Thomas Design Studio

A PD Master Plan for a mixed-use professional development on 45 acres on the south side of Milton Wilson Blvd. The PD incorporates a mixture of retail, office, hospitality (hotel), amenities, and residential uses. No specific end users or building plans are proposed at this time. 
 

A 2021 Amendment revised the plan to add 60 senior housing lofts (age-restricted), replace an office complex with 39 fee-simple ownership townhomes, and replace flex warehouse space with 25 detached single-family homes. 


Approvals:

Mixed Use PD/Master Plan recommended by PC on 02/19/2019, approved by BMA on 4/01/2019
Phase 1 Construction Plans (for infrastructure) approved by PC on 10/21/2019
Master Plan AMENDMENT recommended by PC on 03/15/2021, approved by BMA on 04/05/2021

Initial Starbucks Rendering
Arlington Falls PD, Lot 2
Status:  In process
Location:  West side of Airline Road, roughly 200 ft south of Milton Wilson
Applicant/Owner:  Arlington Development Co.
Engineer/Designer: Renaissance Group

Site Plan for a roughly 5,000sf retail building with 3-suites, including a Starbucks with drive-through lane. 
Amendment submitted after initial approval to revise drive-through layout. 


Approvals:
Approved by PC on 06/15/2020
Amended Site Plan approved by PC on 01/19/2021
DRC tentatively to consider in 05/11/2021

HaysvilleCommons_Site
Haysville Commons
Status:  In process
Location:  Eastern end of Mott Street, adjacent to TDOT facility
Applicant/Owner:  H. Saga International, Inc.
Engineer/Designer: Ledford Engineering Planning & Architecture.

Site Plan for a mixed-use building with roughly 3,400 sf retail/office on the first floor and 3 residential units above on a 1.25-acre lot.  

Approvals:
Approved by PC on 10/19/2020
Approved by DRC on 11/10/2020
BankArlington_Site
Bank of Arlington
Status:  Under Construction
Location:  Northeast corner of Airline Road and Hayes Road
Applicant/Owner:  Bank of Fayette County
Engineer/Designer:  Renaissance Group

Site Plan for a new, roughly 3,300 sf bank building on a 1.3-acre lot.  

Approvals:
Approved by PC on 10/19/2020
Approved by DRC on 12/21/2020

Rapp Rendering
Rapp Development
Status:  Under Construction
Location:  West side of Airline, between Chemtainer and Arlington Climate Control Storage
Applicant/Owner:  Gary Rapp, Jr
Engineer/Designer: Ledford Engineering Planning & Architecture.

Site Plan for a roughly 4,900 sf retail building with 4-bays and a drive-thru lane on a 1-acre lot. 

Approvals:
Approved by PC on 10/19/2020
Approved by DRC on 12/08/2020


site plan_Verizon expansion
Verizon Expansion
Status:  In process
Location:  5866 Jetway Drive
Applicant/Owner:  Verizon Wireless
Engineer/Designer: Kimley-Horn and Associates, Inc.

Site Plan for a roughly 18,000sf expansion of an existing Verizon Wirelss industrial facility. 

Approvals:
Approved by PC on 09/21/2020
Approved by DRC on 11/10/2020

Patriot Bank Rendering sm
Patriot Bank
Status: Under Construction
Location: 5332 Airline Road (northeast corner of Airline & Milton Wilson)
Applicant/Owner: Patriot Bank
Engineer/Designer: Ledford Engineering Planning Architecture

A Site Plan to construct a roughly 6,950 square foot bank building on a 2.6-acre undeveloped commercial site.  

Approvals:
Site Plan approved by PC on 01/21/2020
Site Plan approved by DRC on 03/10/2020


HNA Front Rendering Snip
HNA Engineering
Status:  Under Construction
Location:  5411 Hayes Road
Applicant/Owner:  HNA Building, LLC
Engineer/Designer: The Renaissance Group, Inc.

A Site Plan to construct a roughly 3,390 square foot office building on a half-acre undeveloped office site.  

Approvals:
Site Plan approved by PC on 05/18/2020
Site Plan approved by DRC on 07/14/2020


Site Plan overlay

R&L Carrier Expansion
Status: Under Construction
Location: 11305 Gulf Stream Road
Applicant/Owner: R&L Carriers
Engineer/Designer: Carlson Consulting Engineers

A Site Plan to expand an existing frieght shipping business in the Industrial district. Includes an expansion of the maintenance shop and cross docks on the existing 54.47 acre site.  

Approvals:
Site Plan approved by PC on 02/18/2020
Site Plan approved by DRC on 03/10/2020


Arl Falls Front Elevations Pic
Arlington Falls PD, Lot 4

Status:
Under Construction
Location:  South side of Milton Wilson Blvd., west of Airline Road and across from AHS
Applicant/Owner: Arlington Development Company, LLC
Engineer/Designer: Renaissance Group, Inc.


A Site Plan to construct a new office complex with 11 roughly 6,000 square foot buildings on an undeveloped 5.8-acre commercial lot.   

Approvals:

Site Plan approved by PC on 09/16/2019
Site Plan approved by DRC on 02/11/2020


ArlPhysTherapy_front elevation
Arlington Physical Therapy Center

Status:
Completed
Location: Southeast corner of Airline Road and Hayes Road

Applicant/Owner:
Conell Real Estate
Engineer/Designer:
Renaissance Group, Inc.

A Site Plan to construct a new, roughly 5,400 square foot 3-bay commercial center, to include an Arlington Physical Therapy office, on an undeveloped, 0.73-acre office lot.   

Approvals:

Site Plan approved by PC on 12/16/2019
Site Plan approved by DRC on 01/14/20


Front Elevation Rendering
Sherwin Williams

Status: Completed
Location:  West side of Airline Road, north of Milton Wilson and adjacent to RedMed
Applicant/Owner: Sherwin Williams
Engineer/Designer: Carlson Engineers

A Site Plan to construct a new, roughly 4,000 square foot retail Sherwin Williams store on an undeveloped, 0.8-acre commercial lot. 
 

Approvals:

Site Plan approved by PC on 05/15/2017
Site Plan approved by DRC on 10/08/2019


Front Elevation Rendering_PedsEast
Pediatrics East

Status: Completed
Location:  South side of Cranston Drive, east of Airline Road in the Center at Hayes Crossing PD
Applicant/Owner: Robert Higginbotham, MD
Engineer/Designer: Renaissance Group, Inc.

A Site Plan to construct a new, roughly 7,300 square foot pediatric clinic on an undeveloped, 1.2-acre office lot. 
 

Approvals:

Site Plan approved by PC on 11/18/2019
Site Plan approved by DRC on 12/10/2019
(Back to Top)


Front Elevation Rendering_ArlFalls Lot 3
Arlington Falls PD, Lot 3

Status: In Process
Location:  Southwest corner of Airline Road and Milton Wilson Blvd.
Applicant/Owner: Arlington Development Company, LLC
Engineer/Designer: Renaissance Group, Inc.

A Site Plan to construct a new, roughly 18,000 square foot shopping center on an undeveloped, 3-acre commercial lot. 
 

Approvals:

Site Plan approved by PC on 09/16/2019
Site Plan approved by DRC on 10/08/2019


Waffle House_Front Elevation
Waffle House

Status:
Approved for Construction
Location:  North side of of Hwy 70, approximately 290 feet east of Airline Road (beside First TN Bank)

Applicant/Developer: Waffle House, Inc.
Engineer/Designer: The Reaves Firm, Inc

A Site Plan for a new,
roughly 1,850 square foot Waffle House restaurant on a 0.7-acre, commercial lot.  

Approvals
:

Site Plan approved by PC on 04/15/2019
Site Plan approved by DRC on 05/30/2019


Fairfield Elevation_web

Fairfield Inn and Suites by Marriott
Status: Under Construction
Location:  Southwest corner of Airline and Brooks Branch/I-40
Applicant/Developer: Grant Properties, LLC.
Engineer/Designer: Renaissance Group, Inc.

A Site Plan for a new four-story,
approx. 56,776 sf Marriott hotel on a 2.3 ac site along the south side of I-40 .  

Approvals
:

Site Plan approved by PC on 12/17/2018
Site Plan approved by DRC on 01/15/19
(Back to Top)


Sentry_Elevation_web
Sentry Self Storage

Status:
Completed
Location:  West side of Airline, south of I-40 and Brooks Branch Rd
Applicant/Developer: Grant Properties, LLC
Engineer/Designer: Renaissance Group, Inc.

A Site Plan for a new,
approx. 83,200sf self-storage facility on a 5 acre, commercial lot.  

Approvals
:

Site Plan approved by PC on 12/17/2018
Site Plan approved by DRC on 01/15/2019


 

Cover_Layout Plan
Arlington Trails Commercial PD - Master Development Plan

Status:
Infrastructure Completed
Location:  Southwest corner of I-40 and Airline Road, along Brooks Branch Rd.

Applicant/Developer: Grant Properties LLC; Milton Grant
Engineer/Designer: Renaissance Group;  Wesley Wooldridge

A Master Plan for a commercial Development with seven (7) lots on an approximately 17-acre site.  The plan includes Design Elements to create a unified development with a mix of commercial uses, which will include 2 Marriott hotels (a Fairfield Inn & Suites and a Springhill Suites), a self-storage facility, and other future complementary commercial uses.  

Approvals
:

Master Development Plan considered by PC on 07/16/18; recommended for approval on 08/20/18
Master Development Plan approved by BMA on 10/01/18


 

Landscape Site Plan_KrogerSHOPS
The Shops at Arlington Village
(Airline Road PD, Phase 1) 
 Status: Site work Completed; Outparcel 4 built
Location: Southeast corner of Airline Road and Milton Wilson
Applicant/Developer: Shops Dev, LLC
Engineer/Designer: Cara Martin, Pickering Firm, Inc.

 A Master Development Plan for Phase 1 of the Airline Road PD on a 24-acre parcel, also known as the Shops at Arlington Village.  The proposal included a 123,000 square foot Kroger Marketplace with a drive-thru pharmacy, click list area, and fuel center.  A multi-tenant shopping center and four (4) outparcels are also proposed for the site.    
More information regarding the site can be found by visiting the SHOP Companies website at http://shopcompanies.com/.
 

 Approvals: 
The Shops at Arlington Site Plan and the Kroger Site Plan approved by the DRC on 03/08/2016
Master Development Plan approved by the PC on 02/16/2016 and by the BMA on 02/22/2016
Amendment to the PD (Rezoning) approved by the BMA on on 01/04/2016
Amendment to the PD (Rezoning), Final Plat, and Site Plan approved by the PC on 12/20/2015


(Back to Top)


Residential Projects
   
Note: All images shown on this page are conceptual and may not depict the final product.


WoodlandEst_site new
Woodland Estates PD, General Plan 
Status: In Process
Location: East side of Chester Street, roughly 740 feet south of Pinckley Road
Applicant/Developer: BFR Holdings, LLC
Design Professional: Ledford Engineering, Planning, and Architecture

Proposed General Plan for a Residential Planned Development (PD) on 61 acres of vacant residential land on the east side of Chester Street. The proposal includes 74 detached single-family homes and 26.5 acres of Common Open Space . 
  
Approvals
PD General Plan approved by PC on 01/19/2021, approved by BMA on 03/01/2021
 


WilsonLake Site Plan_Concept
Wilson Lake PD, Master Plan

Status: In Process
Location: North side of Forrest Street, east of Forrest Street Park
Applicant/Developer: Creekside Homes, LLC
Design Professional: The Bray Firm

Proposed Master Plan for a Residential Planned Development (PD) on 38.4 acres of vacant residential land on the north side of Forrest Street. The proposal includes 60 detached single-family homes and 17.11 acres of Common Open Space .
  
Approvals
PD Master Plan to recommended for approval by PC on 02/19/2019
PD Master Plan approved by BMA on 06/03/19


VillageDonelsonFarms_Site
Village at Donelson Farm PD
Status: Under Construction
Location: South side of Donelson Farms Parkway, across road from Donelson Elementary
Applicant/Developer: City Enterprises
Design Professional: SR Consulting, LLC

A Residential Planned Development, including 29 new single-family homes and associated common open space amenities on approximately 13.2 acrs of undeveloped property.
  
Approvals
Master Plan amendment recommended by PC on 05/20/2019; approved by BMA on 08/05/19
Construction Plans approved by PC on 05/18/20


Location Map_White Oak Phases - Copy
Village at White Oak 1st Addition - Phases 5, 9, 14, 15, and 19
Status: Ph 5, 14, & 19 Under Construction; Phases 9 and 15 In Process
Location: west side of Milton Wilson, between Kensington PD and original White Oak neighborhood
Applicant/Developer: Arlington Investors Group, LLC
Design Professional: McGuire Engineering

Plans for constrution of public improvements in 5 additional phases of the approved Master Plan for the Villages at White Oak 1st Addition.
  
Approvals
Constrution Plans for Ph 5 approved by PC on 05/20/2019
Construction Plans for Ph 14 & 19 approved by PC on 05/20/19
Construction Plans for Ph 15 approved by PC on 10/19/20
Construction Plans for Ph 9 approved by PC on 11/16/20



Myers Park_website
Myer's Park PD, Master Plan
Status: Phase 1 Under Construction
Location: Northwest corner of Memphis-Arlington Rd and Gerber Rd
Applicant/Developer: RDKK Holdings, LLC
Design Professional: Dalhoff Thomas Design Studio

Proposed Master Plan for a Mixed Use Planned Development on 38.5 acres of Industrial land at Memphis-Arlington and Gerber Rd. The proposal includes primarily detached single-family homes, with 9 acres of Common Open Space and a small Mixed Use center fronting Memphis-Arlington with neighborhood-serving retail, office, and residential lofts.
  
Approvals
Master Plan considered and not recommended by PC on 08/20/2018
Master Plan considered by BMA on 09/04/2018, and approved on 10/01/2018


 

Belmont Site Plan_PH 2 and 3

Belmont PD, Phases 2 and 3
Status: Phase 2 Complete. Phase 3 Under Construction
Location: North of Forrest Street, East of the Cambridge development, west of the Shelby/Fayette County line
Applicant/Developer: Belmont, LLC
Engineer: Consulting Engineering Services, Inc. 

Phases 2 and 3 of the Belmont PD will continue construction of the Belmont Planned Development (PD), which was originally approved in 2015.  These next phases consist of 58 single-family residential lots (27 in Phase 2 and 31 in Phase 3) and are located immeditaely north of Phase 1 (currently under construction).   
  
Approvals
Common Open Space plans approved by DRC on 02/09/2016
Construction Plans and Plat approved by PC on 05/15/2017

 
(Back to Top)

 