Commercial Projects Residential Projects
You can also check our interactive Development Activity map on the Department's Maps page.
COMMERCIAL PROJECTS
Note: All images shown on this page are conceptual and may not depict the final product.

Site Plan Approved by PC on 08/16/2021
Site Plan Approved by DRC on 10/12/2021


Commercial/Industrial
retail buildings, 3 commercial/office/light industrial buildings and two hotels. Common open space consists of 5.2 acres
General Plan approved by BMA 3/6/2023


Residential
of 37 townhomes, 114 stacked flats, 600 lofts and 30,000 sqft of retail. Common open space
includes 42.9 acres of lakes, greenway, and parks located along each side of Hall Creek
General Plan approved by BMA 3/6/2023

Site Plan Approved by DRC on 12/14/2021

Originally approved by PC 6/15/2020
(Back to Top)

northeast corner of Airline and Arlington Trails, south of I-40.
Site Plan Approved by DRC on 07/13/2021

Site Plan Approved by DRC on 7/12/2022


600 ft north of Milton Wilson and Airline Rd intersection.
Site Plan Approved by DRC 2/14/2023

PC Site Plan on 12/21/2020
DRC Site Plan on 5/11/2021

Site Plan Approved by DRC on 11/8/2022
(Back to Top)

Crye-Leike Commercial Building
Little Commercial subdivision, located on the east side of Airline Road across from the AHS entrance.
Site Plan Approved by DRC on 04/13/2021

 RENDER 001.png)
Providence Place - Mixed Use PD
Status: Under Construction
Location: South side of Milton Wilson, east of the Shops of Arlington Village PD and Hall Creek
Applicant/Owner: Bank of Bartlett
Engineer/Designer: Dalhoff Thomas Design Studio
A PD Master Plan for a mixed-use professional development on 45 acres on the south side of Milton Wilson Blvd.
The PD incorporates a mixture of retail, office, hospitality (hotel), amenities, and residential uses. No specific end users or building plans are proposed at this time.
A 2021 Amendment revised the plan to add 60 senior housing lofts (age-restricted), replace an office complex with 39 fee-simple ownership townhomes, and replace flex warehouse space with 25 detached single-family homes.
Approvals:
Mixed Use PD/Master Plan recommended by PC on 02/19/2019, approved by BMA on 4/01/2019
Phase 1 Construction Plans (for infrastructure) approved by PC on 10/21/2019
Master Plan AMENDMENT recommended by PC on 03/15/2021, approved by BMA on 04/05/2021
Phase 1 Construction Plans (for infrastructure) and Final Plat approved by PC on 7/19/2021
Phase 1 Common Open Space place approved by DRC on 10/12/2021
Phase 2; 39 Townhomes, approved by PC 8/16/2021
Phase 3; 25 single-family residential lots approved by PC 8/16/2021
Phase 4; mixed-use retail/residential approved by PC 8/15/2022
Phase 4; mixed-use retail/residential approved by DRC 11/8/2022

Amendment submitted after initial approval to revise drive-through layout.
Amended Site Plan approved by PC on 01/19/2021
Site plan approved by DRC on 5/11/2021

Site Plan Approved by PC 11/8/2022

Approved by DRC on 11/10/2020
(Back to Top)


MemDent
Approved by DRC 1/10/2023

Whataburger
that fronts Milton Wilson Blvd and Airline Rd.
Approved by DRC on 4/11/2022

Approved by DRC on 11/10/2020
R&L Carrier Expansion
Status: Under Construction
Location: 11305 Gulf Stream Road
Applicant/Owner: R&L Carriers
Engineer/Designer: Carlson Consulting Engineers
Site Plan to expand an existing freight shipping business in the Industrial district. Includes expansion of the maintenance shop and cross docks on the existing 54.47 acre site.
Approvals:
Site Plan approved by PC on 02/18/2020
Site Plan approved by DRC on 03/10/2020
(Back to Top)
Arlington Falls PD, Lot 4
Status: In Process
Location: South side of Milton Wilson Blvd., west of Airline Road and across from AHS
Applicant/Owner: Arlington Development Company, LLC
Engineer/Designer: Renaissance Group, Inc.
A Site Plan to construct a new office complex with 11 roughly 6,000 square foot buildings on an undeveloped 5.8-acre commercial lot.
Approvals:
Site Plan approved by PC on 09/16/2019
Site Plan approved by DRC on 02/11/2020
Arlington Falls PD, Lot 3
Status: Under Construction
Location: Southwest corner of Airline Road and Milton Wilson Blvd.
Applicant/Owner: Arlington Development Company, LLC
Engineer/Designer: Renaissance Group, Inc.
A Site Plan to construct a new, roughly 18,000 square foot shopping center on an undeveloped, 3-acre commercial lot.
Approvals:
Site Plan approved by PC on 09/16/2019
Site Plan approved by DRC on 10/08/2019
Tropical Smoothie
Status: In Process
Location: North Side of Milton Wilson, 240 feet west of Airline Rd
Applicant/Developer: Manoj Patel
Engineer/Designer: McCaskill & Associates, Inc
A Site Plan for a 4,650 square feet 3-bay retail building on 0.802 acres.
Approvals:
Site Plan approved by PC on 12/20/2021
Site Plant approved by DRC on 1/11/2022
(Back to Top)
________________________________________________________________________________________________________________
Crawford Place
Status: Under Construction
Location: West of Airline Rd, approximately 530 ft. from the northernmost property corner to
the intersection of Milton Wilson and Airline
Applicant/Developer: Kelly Richardson Investments
Engineer/Designer: Carlson Consulting Engineers Inc
Site Plan for a five-lot commercial development on 9.38 acres, zoned Shopping Center (SC) and General Business (B-2)
Approvals:
Site Plan approved by PC on 5/16/2022
Site Plan approved by DRC 7/18/2022
Arlington Middle School - Parking Lot Expansion
Status: In Process
Location: Corner of Lamb Rd and Memphis-Arlington Rd
Applicant/Developer: Arlington Board of Education
Engineer/Designer: Wilbanks Architecture & Associates, LLC
Site Plan for a parking lot expansion on the southwest side of the building
Approvals:
Site Plan approved by PC on 12/19/2022
The Shops at Arlington Village
(Airline Road PD, Phase 1)
Status: Site work Completed; Outparcel 4 built
Location: Southeast corner of Airline Road and Milton Wilson
Applicant/Developer: Shops Dev, LLC
Engineer/Designer: Cara Martin, Pickering Firm, Inc.
A Master Development Plan for Phase 1 of the Airline Road PD on a 24-acre parcel, also known as the Shops at Arlington Village. The proposal included a 123,000 square foot Kroger Marketplace with a drive-thru pharmacy, click list area, and fuel center. A multi-tenant shopping center and four (4) outparcels are also proposed for the site.
More information regarding the site can be found by visiting the SHOP Companies website at http://shopcompanies.com/.
Approvals:
The Shops at Arlington Site Plan and the Kroger Site Plan approved by the DRC on 03/08/2016
Master Development Plan approved by the PC on 02/16/2016 and by the BMA on 02/22/2016
Amendment to the PD (Rezoning) approved by the BMA on on 01/04/2016
Amendment to the PD (Rezoning), Final Plat, and Site Plan approved by the PC on 12/20/2015
(Back to Top)
Residential Projects
Note: All images shown on this page are conceptual and may not depict the final product.

PD Master Plan approved by PC on 8/16/20221, approved by BMA on 10/4/2021
Wilson Lake PD, Master Plan
Status: Phase 1 Under Construction, Phase 2 In Process
Location: North side of Forrest Street, east of Forrest Street Park
Applicant/Developer: Creekside Homes, LLC
Design Professional: The Bray Firm
Proposed Master Plan for a Residential Planned Development (PD) on 38.4 acres of vacant residential land on the north side of Forrest Street.
The proposal includes 60 detached single-family homes and 17.11 acres of Common Open Space .
Approvals:
PD Master Plan to recommended for approval by PC on 02/19/2019
PD Master Plan approved by BMA on 06/03/19
Phase 1 Construction Plans approved by PC 9/1/2020
Phase 1 Final Plat approved by PC 11/16/2020
Phase 1 Common Open Space approved by DRC 3/9/2021
Phase 2 Construction Plans approved by PC 8/15/2022
Village at Donelson Farm PD
Status: Under Construction
Location: South side of Donelson Farms Parkway, across road from Donelson Elementary
Applicant/Developer: City Enterprises
Design Professional: SR Consulting, LLC
A Residential Planned Development, including 29 new single-family homes and associated common open space amenities on approximately 13.2 acrs of undeveloped property.
Approvals:
Master Plan amendment recommended by PC on 05/20/2019; approved by BMA on 08/05/19
Construction Plans approved by PC on 05/18/20
Village at White Oak 1st Addition
Status: Ph 5, 9, 14, 15, 19 Under Construction; Phases 16, 17, 19 and 20 In Process
Location: west side of Milton Wilson, between Kensington PD and original White Oak neighborhood
Applicant/Developer: Arlington Investors Group, LLC
Design Professional: McGuire Engineering
Plans for construction of public improvements in 5 additional phases of the approved Master Plan for the Villages at White Oak 1st Addition.
Approvals:
Constrution Plans for Ph 5 approved by PC on 05/20/2019
Construction Plans for Ph 14 & 19 approved by PC on 05/20/19
Construction Plans for Ph 15 approved by PC on 10/19/20
Construction Plans for Ph 9 approved by PC on 11/16/20
Construction plans for 16 & 17 approved by PC 9/20/2021
Construction Plans and Final Plat for 20 approved by PC 12/20/2021
Construction Plans and Final Plat for 7& 12 approved by PC 11/21/2022
Myer's Park PD, Master Plan
Status: Under Construction
Location: Northwest corner of Memphis-Arlington Rd and Gerber Rd
Applicant/Developer: RDKK Holdings, LLC
Design Professional: Dalhoff Thomas Design Studio
Proposed Master Plan for a Mixed Use Planned Development on 38.5 acres of Industrial land at Memphis-Arlington and Gerber Rd. The proposal includes primarily detached single-family homes, with 9 acres of Common Open Space and a small Mixed Use center fronting Memphis-Arlington with neighborhood-serving retail, office, and residential lofts.
Approvals:
Master Plan considered and not recommended by PC on 08/20/2018
Master Plan considered by BMA on 09/04/2018, and approved on 10/01/2018
Phase 1 Construction Plans approved 5/20/2019
Phase 1 Final Plat approved 6/17/2019
Phase 2 & 4 Construction Plans & Final Plat approved by PC 10/19/2020
Phase 3 & 5 Construction Plans & Final Plat approved by PC 10/18/2021
Belmont PD, Phase 4
Status: Under Construction
Location: North of Forrest Street, East of the Cambridge development, west of the Shelby/Fayette County line
Applicant/Developer: Belmont, LLC
Engineer: The Bray Firm
Phases 1, 2 and 3 of the Belmont Planned Development (PD), which was originally approved in 2015, have been completed.
Phase 4 will consist of 32 single-family residential lots north of Phase 3.
Approvals:
Common Open Space plans approved by DRC on 02/09/2016
Phase 2 & 3 Construction Plans and Plat approved by PC on 05/15/2017
Phase 4 Construction Plans approved by PC 10/19/2020
Phase 4 Final Plat approved by PC 5/15/2021
______________________________________________________________________________________________________________________________________
Manor at Hall Creek
Status: Phase 1 under Construction
Location: South side of Summers Rd, east of I-269
Applicant/Developer: Summers Road Partners
Engineer: Lawson Engineering
Proposed Residential Planned Development, totaling 56 new single-family homes between Phase 1 and Phase 2 on 34.66 acres.
Phase 1 includes 16 acres, building 27 single family homes and 5.39 acres of common open space.
Approvals:
Construction Plans and Plat considered and approved by PC 6/21/2021
Common Open Space plans considered and approved by DRC 10/12-2021
Rush Landing Subdivision
Status: In Process
Location: South of Harrell Rd abutting Harrell's Ridge on western property line
Applicant/Developer: Rick and Beth Rush
Engineer: Wilbanks Architecture & Associates LLC
Proposed subdivision on 12.68 acres to create 9 single family lots, minimum 1 acre lots.
Approvals:
Preliminary Plat approved by PC 3/21/2022
Construction Plans and Final Plat approved by PC 6/20/2022
(Back to Top)