Current Projects

Request email notification when page changes E-Notify

Commercial Projects              Residential Projects

You can also check our interactive Development Activity map on the Department's Maps page.


COMMERCIAL PROJECTS
Note:  All images shown on this page are conceptual and may not depict the final product.

WTVH elevation pics
West Tennessee Veterans' Home
Status:  In process
Location:  5240 Elm Park Street, west of Hwy 385 and south of the TN Developmental Center
Applicant/Owner:  State of TN
Engineer/Designer: Orcutt Winslow

Master Plan and Site Plan for a the new West TN Veterans' Home, a skilled nursing care facility for veterans, veteran spouses, and Gold Star parents, on a 28.65 acre property located just south of the TN Developmental Center. 

Approvals:
Master Plan Approved by BMA on 06/07/21
Site Plan Approved by PC on 08/16/2021
Site Plan Approved by DRC on 10/12/2021

Hawthorne Site Map

Hawthorne PDCI

Hawthorne Rendering 2 - PD-C looking down main corridor

Hawthorne - General Planned Development
Commercial/Industrial
Status:  Approved
Location:  South of Summers Rd north of I-40 between Hwy 385 and Airline Rd
Applicant/Owner:  Beacon Companies
Engineer/Designer: Design Studio

General Development Plan for a commercial planned development containing 26.5 acres consisting of 4 commercial/
retail buildings, 3 commercial/office/light industrial buildings and two hotels. Common open space consists of 5.2 acres


Approvals:
General Plan recommended by PC 2/21/2023
General Plan approved by BMA 3/6/2023


Hawthorne Site Map

PDR

Hawthorne Rendering 1 - townhome-stackedflat  

Hawthorne - General Planned Development
Residential 
Status:  Approved
Location:  South of Summers Rd north of I-40 between Hwy 385 and Airline Rd
Applicant/Owner:  Beacon Companies
Engineer/Designer: Design Studio

General Development Plan for a residential planned development containing 66.1 acres consisting
of 37 townhomes, 114 stacked flats, 600 lofts and 30,000 sqft of retail. Common open space
includes 42.9 acres of lakes, greenway, and parks located along each side of Hall Creek


Approvals:
General Plan recommended by PC 2/21/2023
General Plan approved by BMA 3/6/2023


Sprinhill Suites_site plan pic

Springhill Suites hotel
Status:  Under Construction
Location:  West end of Fair Springs Cove; west of Airline Road and south of I-40
Applicant/Owner:  Milton Grant, Grant Properties, LLC
Engineer/Designer: Renaissance Group

Site Plan for a new 124-room hotel on the west side of Fair Springs Cove, across the cul-de-sac from the Fairfield Inn hotel. 

Approvals:
Site Plan Approved by PC on 09/20/21
Site Plan Approved by DRC on 12/14/2021

Steamfitters

Steamfitters Parking Lot Expansion
Status:  In process
Location: 5670 Commander Dr
Applicant/Owner:  United Association Local 614
Engineer/Designer: Wilbanks Architecture & Associates LLC

Site plan for a parking lot expansion, east of existing parking lot, to serve the site. 

Approvals:
Originally approved by PC 6/15/2020
Site Plan Re-approved by PC 8/15/2022
(Back to Top)

TravelExpress_elevations pic

Airline Travel Express
Status:  Under Construction
Location: Northeast corner of Airline Road and Arlington Trails 
Applicant/Owner:  United Arlington, LLC
Engineer/Designer: McGehee Nicholson Burke Architects, LLC

Site Plan for a the new 7,526sf building with two suites, to accommodate a gas station and restaurant, located on a 1.5-acre lot on the
northeast corner of Airline and Arlington Trails, south of I-40. 


Approvals:
Site Plan Approved by PC on 05/17/2021
Site Plan Approved by DRC on 07/13/2021

Midsouth site
Mid-South Septic Expansion 
Status:  In process
Location: East of Gerber Rd, north of Gulfstream Rd
Applicant/Owner:  Mid-South Septic Service
Engineer/Designer: Wilbanks Architecture & Associates LLC

Site Plan for a the new 9,000 sq ft warehouse on 4.87 -acres west of the existing Mid-South Septic facility 

Approvals:
Site Plan Approved by PC on 5/16/2022
Site Plan Approved by DRC on 7/12/2022

2023-02-21_Chipotle_Site Plan2023-01-31_CHIPOTLE_DRC SITE PLAN_REV003 ELEVATIONS
Chipotle
Status:  In process
Location: 5352 Airline Rd
Applicant/Owner:  Chipotle
Engineer/Designer: Wilbanks Architecture & Associates

Site Plan for a 2,325 sqft fast casual drive-through restaurant on 2.126 acres on the east side of Airline Rd,
600 ft north of Milton Wilson and Airline Rd intersection.


Approvals:
Site Plan Approved by PC 2/21/2023
Site Plan Approved by DRC 2/14/2023


Island Gas
Island Gas
Status:  Under Construction
Location:  4861 Airline Rd 
Applicant/Owner:  Phoenix Airline LLC
Engineer/Designer: Ledford Engineering

Site Plan for a 2,200 sqft gas station located on a 0.99 acre lot at the intersection of Airline Rd and Brooks River Dr 

Approvals:
Land Disturbance Permit on 11/16/2020
PC Site Plan on 12/21/2020
DRC Site Plan on 5/11/2021

delta site plan

Delta Industries
Status:  In process
Location: Eastridge Business Park, west end of Cypress Creek Dr
Applicant/Owner:  Delta Acquisitions LLC
Engineer/Designer: Renaissance Group Inc

Site Plan for a concrete plant including a 741 sqft batch house, 2 mixing plants, assorted aggerate bin areas, a fueling station and parking

Approvals:
Site Plan Approved by PC on 08/15/2022
Site Plan Approved by DRC on 11/8/2022
(Back to Top)

CryeLeike_Front Elevation pic
Crye-Leike Commercial Building
Status:  In process
Location:  5476 Airline Road
Applicant/Owner:  Harold Crye 
Engineer/Designer: Wilbanks Architecture & Associates LLC

Site Plan for a the new 8,400sf, 6-bay commercial building and associated parking and improvements on Lot 1 of the
Little Commercial subdivision, located on the east side of Airline Road across from the AHS entrance. 


Approvals:
Site Plan Approved by PC on 8/15/2022
Site Plan Approved by DRC on 04/13/2021

Prov Place OverviewProvidence Place Lofts_DRC Full Set (Revised 10.26) RENDER 001
Providence Place - Mixed Use PD
Status: Under Construction
Location:  South side of Milton Wilson, east of the Shops of Arlington Village PD and Hall Creek
Applicant/Owner: Bank of Bartlett
Engineer/Designer: Dalhoff Thomas Design Studio

A PD Master Plan for a mixed-use professional development on 45 acres on the south side of Milton Wilson Blvd.
The PD incorporates a mixture of retail, office, hospitality (hotel), amenities, and residential uses. No specific end users or building plans are proposed at this time. 
 

A 2021 Amendment revised the plan to add 60 senior housing lofts (age-restricted), replace an office complex with 39 fee-simple ownership townhomes, and replace flex warehouse space with 25 detached single-family homes. 


Approvals:

Mixed Use PD/Master Plan recommended by PC on 02/19/2019, approved by BMA on 4/01/2019
Phase 1 Construction Plans (for infrastructure) approved by PC on 10/21/2019
Master Plan AMENDMENT recommended by PC on 03/15/2021, approved by BMA on 04/05/2021
Phase 1 Construction Plans (for infrastructure) and Final Plat approved by PC on 7/19/2021
Phase 1 Common Open Space place approved by DRC on 10/12/2021
Phase 2; 39 Townhomes, approved by PC 8/16/2021
Phase 3; 25 single-family residential lots approved by PC 8/16/2021
Phase 4; mixed-use retail/residential approved by PC 8/15/2022
Phase 4; mixed-use retail/residential approved by DRC 11/8/2022


Initial Starbucks Rendering
Arlington Falls PD, Lot 2
Status:  Under Construction
Location:  West side of Airline Road, roughly 200 ft south of Milton Wilson
Applicant/Owner:  Arlington Development Co.
Engineer/Designer: Renaissance Group

Site Plan for a roughly 5,000sf retail building with 3-suites, including a Starbucks with drive-through lane. 
Amendment submitted after initial approval to revise drive-through layout. 


Approvals:
Approved by PC on 06/15/2020
Amended Site Plan approved by PC on 01/19/2021
Site plan approved by DRC on 5/11/2021

lofts on sq

Lofts on the Square
Status:  In process
Location: North of Forrest St, west of the Masonic Lodge
Applicant/Owner:  Barbara Devivo
Engineer/Designer: Renaissance Group Inc

Development of a mixed-use retail/residential building on a 0.224-acre lot on the north side of Forrest St, adjacent to the Masonic Lodge. 

Approvals:
Site Plan Approved by PC 8/15/2022
Site Plan Approved by PC 11/8/2022

HaysvilleCommons_Site
Haysville Commons
Status:  In process
Location:  Eastern end of Mott Street, adjacent to TDOT facility
Applicant/Owner:  H. Saga International, Inc.
Engineer/Designer: Ledford Engineering Planning & Architecture.

Site Plan for a mixed-use building with roughly 3,400 sf retail/office on the first floor and 3 residential units above on a 1.25-acre lot.  

Approvals:
Approved by PC on 10/19/2020
Approved by DRC on 11/10/2020
(Back to Top)



Scooter Site Plan
Scooter's Coffee
Status:  In process
Location:  West side of Airline Rd, approximately 300 feet south of Airline Rd and Memphis-Arlington intersection
Applicant/Owner:  Five Star Development of Alabama, Inc
Engineer/Designer: Lindfield, Hunter & Junius, Inc

Site Plan for a 664 sqft drive-through coffee shop on 0.63 acres west of Airline Rd  

Approvals:
Approved by PC on 3/20/2023


MemDent Site Plan
MemDent
Status:  In Process
Location: West of Airline Rd, north of ABC Childcare
Applicant/Owner:  MemDent Properties Partnership
Engineer/Designer:  Wilbanks Architecture & Associates LLC

Site Plan for a 3-lot commercial medical development

Approvals:
Approved by PC 7/18/2022
Approved by DRC 1/10/2023

Whataburger
Whataburger
Status:  Under Construction
Location:  Southwest corner of Milton Wilson Blvd and Airline Rd
Applicant/Owner:  Andrew Beaupre
Engineer/Designer: Kimley-Horn & Associates

Site Plan for a 3,751 square foot building for a restaurant with a drive-through.  This site is proposed to be on a 2.13 acre lot 
that fronts Milton Wilson Blvd and Airline Rd.
 

Approvals:
Approved by PC on 3/21/2022
Approved by DRC on 4/11/2022


site plan_Verizon expansion
Verizon Expansion
Status:  Under Construction
Location:  5866 Jetway Drive
Applicant/Owner:  Verizon Wireless
Engineer/Designer: Kimley-Horn and Associates, Inc.

Site Plan for a roughly 18,000sf expansion of an existing Verizon Wireless industrial facility. 

Approvals:
Approved by PC on 09/21/2020
Approved by DRC on 11/10/2020

Site Plan overlay

R&L Carrier Expansion
Status: Under Construction
Location: 11305 Gulf Stream Road
Applicant/Owner: R&L Carriers
Engineer/Designer: Carlson Consulting Engineers

Site Plan to expand an existing freight shipping business in the Industrial district. Includes expansion of the maintenance shop and cross docks on the existing 54.47 acre site.  

Approvals:
Site Plan approved by PC on 02/18/2020
Site Plan approved by DRC on 03/10/2020
(Back to Top)

Arl Falls Front Elevations Pic
Arlington Falls PD, Lot 4
Status
: In Process

Location:  South side of Milton Wilson Blvd., west of Airline Road and across from AHS
Applicant/Owner: Arlington Development Company, LLC
Engineer/Designer: Renaissance Group, Inc.

A Site Plan to construct a new office complex with 11 roughly 6,000 square foot buildings on an undeveloped 5.8-acre commercial lot. 
Approvals:

Site Plan approved by PC on 09/16/2019
Site Plan approved by DRC on 02/11/2020


Front Elevation Rendering_ArlFalls Lot 3
Arlington Falls PD, Lot 3

Status
: Under Construction 

Location:  Southwest corner of Airline Road and Milton Wilson Blvd.
Applicant/Owner: Arlington Development Company, LLC
Engineer/Designer: Renaissance Group, Inc.

A Site Plan to construct a new, roughly 18,000 square foot shopping center on an undeveloped, 3-acre commercial lot. 

Approvals:

Site Plan approved by PC on 09/16/2019
Site Plan approved by DRC on 10/08/2019




SouthwestCorner

Tropical Smoothie
Status:
In Process
Location:  North Side of Milton Wilson, 240 feet west of Airline Rd
Applicant/Developer: Manoj Patel
Engineer/Designer: McCaskill & Associates, Inc
A Site Plan for a 4,650 square feet 3-bay retail building on 0.802 acres.

Approvals
:

Site Plan approved by PC on 12/20/2021
Site Plant approved by DRC on 1/11/2022

(Back to Top)
________________________________________________________________________________________________________________

Crawford site
CRAWFORd PL LOTS
Crawford Place
Status:
Under Construction
Location:  West of Airline Rd, approximately 530 ft. from the northernmost property corner to
the intersection of Milton Wilson and Airline
Applicant/Developer: Kelly Richardson Investments
Engineer/Designer: Carlson Consulting Engineers Inc

Site Plan for a five-lot commercial development on 9.38 acres, zoned Shopping Center (SC) and General Business (B-2)

Approvals
:
Site Plan approved by PC on 5/16/2022
Site Plan approved by DRC 7/18/2022



BASE SITE OL - Copy


Arlington Middle School - Parking Lot Expansion
Status:
In Process
Location:  Corner of Lamb Rd and Memphis-Arlington Rd
Applicant/Developer: Arlington Board of Education
Engineer/Designer: Wilbanks Architecture & Associates, LLC

Site Plan for a parking lot expansion on the southwest side of the building

Approvals
:
Site Plan approved by PC on 12/19/2022


Landscape Site Plan_KrogerSHOPS
The Shops at Arlington Village
(Airline Road PD, Phase 1) 
 Status: Site work Completed; Outparcel 4 built
Location: Southeast corner of Airline Road and Milton Wilson
Applicant/Developer: Shops Dev, LLC
Engineer/Designer: Cara Martin, Pickering Firm, Inc.

 A Master Development Plan for Phase 1 of the Airline Road PD on a 24-acre parcel, also known as the Shops at Arlington Village.  The proposal included a 123,000 square foot Kroger Marketplace with a drive-thru pharmacy, click list area, and fuel center.  A multi-tenant shopping center and four (4) outparcels are also proposed for the site.    
More information regarding the site can be found by visiting the SHOP Companies website at http://shopcompanies.com/.
 

 Approvals: 
The Shops at Arlington Site Plan and the Kroger Site Plan approved by the DRC on 03/08/2016
Master Development Plan approved by the PC on 02/16/2016 and by the BMA on 02/22/2016
Amendment to the PD (Rezoning) approved by the BMA on on 01/04/2016
Amendment to the PD (Rezoning), Final Plat, and Site Plan approved by the PC on 12/20/2015


(Back to Top)


Residential Projects
   
Note: All images shown on this page are conceptual and may not depict the final product.


WoodlandEst_site new
Woodland Estates PD, General Plan 
Status: In Process
Location: East side of Chester Street, roughly 740 feet south of Pinckley Road
Applicant/Developer: BFR Holdings, LLC
Design Professional: Ledford Engineering, Planning, and Architecture

Proposed General Plan for a Residential Planned Development (PD) on 61 acres of vacant residential land on the east side of Chester Street. The proposal includes 74 detached single-family homes and 26.5 acres of Common Open Space . 
  
Approvals
PD General Plan approved by PC on 01/19/2021, approved by BMA on 03/01/2021
PD Master Plan approved by PC on 8/16/20221, approved by BMA on 10/4/2021
 


WilsonLake Site Plan_Concept
Wilson Lake PD, Master Plan

Status: Phase 1 Under Construction, Phase 2 In Process
Location: North side of Forrest Street, east of Forrest Street Park
Applicant/Developer: Creekside Homes, LLC
Design Professional: The Bray Firm

Proposed Master Plan for a Residential Planned Development (PD) on 38.4 acres of vacant residential land on the north side of Forrest Street.
The proposal includes 60 detached single-family homes and 17.11 acres of Common Open Space .
  
Approvals
PD Master Plan to recommended for approval by PC on 02/19/2019
PD Master Plan approved by BMA on 06/03/19
Phase 1 Construction Plans approved by PC 9/1/2020
Phase 1 Final Plat approved by PC 11/16/2020
Phase 1 Common Open Space approved by DRC 3/9/2021
Phase 2 Construction Plans approved by PC 8/15/2022


VillageDonelsonFarms_Site
Village at Donelson Farm PD
Status: Under Construction
Location: South side of Donelson Farms Parkway, across road from Donelson Elementary
Applicant/Developer: City Enterprises
Design Professional: SR Consulting, LLC

A Residential Planned Development, including 29 new single-family homes and associated common open space amenities on approximately 13.2 acrs of undeveloped property.
  
Approvals
Master Plan amendment recommended by PC on 05/20/2019; approved by BMA on 08/05/19
Construction Plans approved by PC on 05/18/20


Location Map_White Oak Phases - Copy
Village at White Oak 1st Addition 
Status: Ph 5, 9, 14, 15, 19 Under Construction; Phases 16, 17, 19 and 20 In Process
Location: west side of Milton Wilson, between Kensington PD and original White Oak neighborhood
Applicant/Developer: Arlington Investors Group, LLC
Design Professional: McGuire Engineering

Plans for construction of public improvements in 5 additional phases of the approved Master Plan for the Villages at White Oak 1st Addition.
  
Approvals
Constrution Plans for Ph 5 approved by PC on 05/20/2019
Construction Plans for Ph 14 & 19 approved by PC on 05/20/19
Construction Plans for Ph 15 approved by PC on 10/19/20
Construction Plans for Ph 9 approved by PC on 11/16/20
Construction plans for 16 & 17 approved by PC 9/20/2021
Construction Plans and Final Plat for 20 approved by PC 12/20/2021
Construction Plans and Final Plat for 7& 12 approved by PC 11/21/2022



Myers Park_website
Myer's Park PD, Master Plan
Status: Under Construction
Location: Northwest corner of Memphis-Arlington Rd and Gerber Rd
Applicant/Developer: RDKK Holdings, LLC
Design Professional: Dalhoff Thomas Design Studio

Proposed Master Plan for a Mixed Use Planned Development on 38.5 acres of Industrial land at Memphis-Arlington and Gerber Rd. The proposal includes primarily detached single-family homes, with 9 acres of Common Open Space and a small Mixed Use center fronting Memphis-Arlington with neighborhood-serving retail, office, and residential lofts.
  
Approvals
Master Plan considered and not recommended by PC on 08/20/2018
Master Plan considered by BMA on 09/04/2018, and approved on 10/01/2018
Phase 1 Construction Plans approved 5/20/2019
Phase 1 Final Plat approved 6/17/2019
Phase 2 & 4 Construction Plans & Final Plat approved by PC 10/19/2020
Phase 3 & 5 Construction Plans & Final Plat approved by PC 10/18/2021


 

belmont ph4

Belmont PD, Phase 4
Status: Under Construction
Location: North of Forrest Street, East of the Cambridge development, west of the Shelby/Fayette County line
Applicant/Developer: Belmont, LLC
Engineer: The Bray Firm

Phases 1, 2 and 3 of the Belmont Planned Development (PD), which was originally approved in 2015, have been completed.
Phase 4 will consist of 32 single-family residential lots north of Phase 3.
  
Approvals
Common Open Space plans approved by DRC on 02/09/2016
Phase 2 & 3 Construction Plans and Plat approved by PC on 05/15/2017
Phase 4 Construction Plans approved by PC 10/19/2020
Phase 4 Final Plat approved by PC 5/15/2021


______________________________________________________________________________________________________________________________________


SITE FOR WEB

Manor at Hall Creek
Status: Phase 1 under Construction
Location: South side of Summers Rd, east of I-269
Applicant/Developer: Summers Road Partners
Engineer: Lawson Engineering

Proposed Residential Planned Development, totaling 56 new single-family homes between Phase 1 and Phase 2 on 34.66 acres.
Phase 1 includes 16 acres, building 27 single family homes and 5.39 acres of common open space.  

  
Approvals
Construction Plans and Plat considered and approved by PC 6/21/2021
Common Open Space plans considered and approved by DRC 10/12-2021


Rush Landing

Rush Landing Subdivision
Status: In Process
Location: South of Harrell Rd abutting Harrell's Ridge on western property line
Applicant/Developer: Rick and Beth Rush
Engineer: Wilbanks Architecture & Associates LLC

Proposed subdivision on 12.68 acres to create 9 single family lots, minimum 1 acre lots.
  
Approvals
Preliminary Plat approved by PC 3/21/2022
Construction Plans and Final Plat approved by PC 6/20/2022

(Back to Top)

 

Planning and Development

Areas of
Interest

SEE FULL MAP