Current Projects

Request email notification when page changes E-Notify

Commercial Projects              Residential Projects

Wondering what that project is you saw in Town?? You can also check our interactive Development Activity map on the Department's Maps page.


Commercial Projects
Note:  All images shown on this page are conceptual and may not depict the final product.


Patriot Bank Rendering sm
Patriot Bank
Status: Under Construction
Location: 5332 Airline Road (northeast corner of Airline & Milton Wilson)

Applicant/Owner:
Patriot Bank
Engineer/Designer:
Ledford Engineering Planning Architecture

A Site Plan to construct a roughly 6,950 square foot bank building on a 2.6-acre undeveloped commercial site.  

Approvals:

Site Plan approved by PC on 01/21/2020
Site Plan approved by DRC on 03/10/20


HNA Front Rendering Snip
HNA Engineering
Status:  In process
Location:  5411 Hayes Road
Applicant/Owner:  HNA Building, LLC
Engineer/Designer: The Renaissance Group, Inc.

A Site Plan to construct a roughly 3,390 square foot office building on a half-acre undeveloped office site.  
Approvals:
Site Plan approved by PC on 05/18/2020 
 Site Plan to be considered by DRC on 06/09/20



Site Plan overlay

R&L Carrier Expansion
Status: In Review
Location: 11305 Gulf Stream Road

Applicant/Owner:
R&L Carriers
Engineer/Designer:
Carlson Consulting Engineers

A Site Plan to expand an existing frieght shipping business in the Industrial district. Includes an expansion of the maintenance shop and cross docks on the existing 54.47 acre site.  

Approvals:

Site Plan approved by PC on 02/18/2020
Site Plan approved by DRC on 03/10/20


Arl Falls Front Elevations Pic
Arlington Falls PD, Lot 4

Status:
Under Construction
Location:  South side of Milton Wilson Blvd., west of Airline Road and across from AHS
Applicant/Owner: Arlington Development Company, LLC
Engineer/Designer: Renaissance Group, Inc.


A Site Plan to construct a new office complex with 11 roughly 6,000 square foot buildings on an undeveloped 5.8-acre commercial lot.   

Approvals:

Site Plan approved by PC on 09/16/2019
Site Plan approved by DRC on 02/11/20


ArlPhysTherapy_front elevation
Arlington Physical Therapy Center

Status:
Under Construction
Location: Southeast corner of Airline Road and Hayes Road

Applicant/Owner:
Conell Real Estate
Engineer/Designer:
Renaissance Group, Inc.

A Site Plan to construct a new, roughly 5,400 square foot 3-bay commercial center, to include an Arlington Physical Therapy office, on an undeveloped, 0.73-acre office lot.   

Approvals:

Site Plan approved by PC on 12/16/2019
Site Plan approved by DRC on 01/14/20


Front Elevation Rendering
Sherwin Williams

Status: Under Construction
Location:  West side of Airline Road, north of Milton Wilson and adjacent to RedMed
Applicant/Owner: Sherwin Williams
Engineer/Designer: Carlson Engineers

A Site Plan to construct a new, roughly 4,000 square foot retail Sherwin Williams store on an undeveloped, 0.8-acre commercial lot. 
 

Approvals:

Site Plan approved by PC on 05/15/2017
Site Plan approved by DRC on 10/08/2019


Front Elevation Rendering_PedsEast
Pediatrics East

Status: Under Construction
Location:  South side of Cranston Drive, east of Airline Road in the Center at Hayes Crossing PD
Applicant/Owner: Robert Higginbotham, MD
Engineer/Designer: Renaissance Group, Inc.

A Site Plan to construct a new, roughly 7,300 square foot pediatric clinic on an undeveloped, 1.2-acre office lot. 
 

Approvals:

Site Plan approved by PC on 11/18/2019
Site Plan approved by DRC on 12/10/19
(Back to Top)


Front Elevation Rendering_ArlFalls Lot 3
Arlington Falls PD, Lot 3

Status: In Process
Location:  Southwest corner of Airline Road and Milton Wilson Blvd.
Applicant/Owner: Arlington Development Company, LLC
Engineer/Designer: Renaissance Group, Inc.

A Site Plan to construct a new, roughly 18,000 square foot shopping center on an undeveloped, 3-acre commercial lot. 
 

Approvals:

Site Plan approved by PC on 09/16/2019
Site Plan approved by DRC on 10/08/2019



Animal Clinic_Front Elevation - Copy
Arlington Animal Clinic
Status: Under Construction
Location:  Southeast corner of Airline Road and Village Center Drive
Applicant/Owner: Monica Schoknect, DVM
Engineer/Designer: Ledford Engineering and Planning

A Site Plan to construct a new, roughly 7,200 square foot veterinarian clinic on an undeveloped, 1-acre commercial lot. 
 

Approvals:

Site Plan approved by PC on 11/19/2018
Site Plan approved by DRC on 06/14/2016 (building did not change since original approval)


Waffle House_Front Elevation
Waffle House

Status:
In Process
Location:  North side of of Hwy 70, approximately 290 feet east of Airline Road (beside First TN Bank)

Applicant/Developer: Waffle House, Inc.
Engineer/Designer: The Reaves Firm, Inc

A Site Plan for a new,
roughly 1,850 square foot Waffle House restaurant on a 0.7-acre, commercial lot.  

Approvals
:

Site Plan approved by PC on 04/15/2019
Site Plan approved by DRC on 05/30/2019


Concept Plan_Arl Commons_sm
Providence Place - Mixed Use PD

Status: In Process
Location:  South side of Milton Wilson, east of the Shops of Arlington Village PD and Hall Creek
Applicant/Owner: Bank of Bartlett
Engineer/Designer: Dalhoff Thomas Design Studio

A PD Master Plan that establishes a layout and design guidelines for a mixed-use professional development on 45 acres of industrial zoned property on the south side of Milton Wilson Blvd. The PD incorporates a mixture of retail, office, hospitality, amenities, and residential lofts. No specific end users or building plans are proposed at this time. 
 

Approvals:

Mixed Use PD/Master Plan considered by PC on 01/22/19 and recommended on 02/19/2019
Mixed Use PD/Master Plan approved by BMA on 04/01/2019
Phase 1 Construction Plans (for infrastructure) approved by PC on 10/21/2019


ABRA_Elevation_web
ABRA Auto Body

Status:
Completed
Location:  West side of Airline Road, roughly 600 ft south of Memphis-Arlington Rd

Applicant/Developer: Oldacre McDonald, LLC
Engineer/Designer: Kimley Horn

A Site Plan for a new,
approx. 18,000sf, auto body repair business on a 2 acre, commercial lot.  

Approvals
:

Site Plan approved by PC on 12/17/2018
Site Plan approved by DRC on 01/15/19


Elevation_web jpg2
Wendy's

Status:
Under Construction
Location:  Southwest corner of Airline and Memphis-Arlington Road

Applicant/Developer: Wendelta Property Holdings
Engineer/Designer: Pickering Firm

A Site Plan for a new,
approx. 2,500sf, drive through restaurant on a 1 acre, commercial lot.  

Approvals
:

Site Plan approved by PC on 12/17/2018
Site Plan approved by DRC on 01/15/19


Fairfield Elevation_web
Fairfield Inn and Suites by Marriott

Status: Under Construction
Location:  Southwest corner of Airline and Brooks Branch/I-40

Applicant/Developer: Grant Properties, LLC.
Engineer/Designer: Renaissance Group, Inc.

A Site Plan for a new four-story,
approx. 56,776 sf Marriott hotel on a 2.3 ac site along the south side of I-40 .  

Approvals
:

Site Plan approved by PC on 12/17/2018
Site Plan approved by DRC on 01/15/19
(Back to Top)


Sentry_Elevation_web
Sentry Self Storage

Status:
Under Construction
Location:  West side of Airline, south of I-40 and Brooks Branch Rd

Applicant/Developer: Grant Properties, LLC
Engineer/Designer: Renaissance Group, Inc.

A Site Plan for a new,
approx. 83,200sf self-storage facility on a 5 acre, commercial lot.  

Approvals
:

Site Plan approved by PC on 12/17/2018
Site Plan approved by DRC on 01/15/2019


Regions Bank Rendering_from Airline_sm

Regions Bank
Status:
Completed.
Location:  4900 Milton Wilson Blvd; southeast corner of Airline and Milton Wilson 
Applicant/Developer: Regions Bank
Engineer/Designer: The Roberts Group

A Site Plan for a new, 
approx. 2,257sf bank building on a 0.87-acre, commercial lot.   

Approvals
:

Site Plan approved by PC on 09/17/2018
Site Plan approved by DRC on 11/13/2018


Wright Rendering_Pic Only
Wright Medical Expansion
Status:
Completed
Location:  11576 Memphis-Arlington Road

Applicant/Developer: Wright Medical Technology, Inc.
Engineer/Designer: HM Architects/Engineers, Inc.

A Site Plan for a new industrial warehouse at the existing Wright Medical facility on Memphis-Arlington Road.  

Approvals
:

Site Plan approved by PC on 07/16/2018
Site Plan approved by DRC on 8/14/18


Cover_Layout Plan
Arlington Trails Commercial PD - Master Development Plan

Status:
Infrastructure Under Construction
Location:  Southwest corner of I-40 and Airline Road, along Brooks Branch Rd.

Applicant/Developer: Grant Properties LLC; Milton Grant
Engineer/Designer: Renaissance Group;  Wesley Wooldridge

A Master Plan for a commercial Development which will include seven (7) lots on an approximately 17-acre site.  The plan includes Design Elements to create a unified development with a mix of commercial uses, which will include 2 Marriott hotels (a Fairfield Inn & Suites and a Springhill Suites), a self-storage facility, and other future complementary commercial uses.  

Approvals
:

Master Development Plan considered by PC on 07/16/18; recommended for approval on 08/20/18
Master Development Plan approved by BMA on 10/01/18



Rendering_HaysArl Commons
Haysville-Arlington Commons PD

Status
In Process
Location:  South side of Mott Street, eastern end, roughly 400 feet east of Chester St.
Applicant/Developer: H. Saga International, Inc.; Bob Wilson
Engineer/Designer: Ledford Engineering, Planning, Architecture; Kevin Ledford

A Planned Development to build a two-story,  approximately 25,000 square foot mixed-use building on a 1.29-acre site. The project will include a mix of retail and office on the ground floor, with 10 single-family residential units above.  
Approvals:
Master Development Plan recommended for approval by PC on 12/18/2017,  approved by BMA on 02/05/2018
Site Plan approved by DRC on 02/13/2018
Construction Plans for PC consideration on 4/16/2018

Rendering Pic

Greenlee Street Offices
 Status: 1 of 2 buildings Completed.
Location:  Northwest corner of Greenlee St. and Mott Street

Applicant/Developer: Meridian Properties, Bart Thomas
Engineer/Designer: The Renaissance Group, Wesley Wooldridge


A request to build  two, single-story,  6,375 square foot office buildings on a 1.26-acre site. 

Approvals:

Site Plan approved by PC on 9/18/2017
Site Plan approved by the DRC on 10/10/2017

North Elevation_revised
Brendalay Grill
 Status: Under Construction
Location:  6359 Quintard Street

Applicant/Developer: Deven Patel (owner)
Engineer/Designer: Jeff Blackledge Architecture, The Bray Firm


A request to build a two-story, roughly 8,000 square foot sit-down restaurant with an apartment upstairs on a 2.2-acre site. 

Approvals:

Site Plan approved by PC on 9/18/2017
Site Plan approved by DRC on 10/10/2017

(Back to Top)

DepotSquare_Rendering pic


Arlington Depot Square Project
 Status: Completed
Location:  
Northwest corner of Walker Street and Quintard
Applicant/Developer: Cotton Gin Joint Venture
Engineer/Designer: Renaissance Group, Inc. 

A request to construct a two-story, approximately 12,800 square foot retail/office building on the southeast corner of the parcel with associated parking. 

Approvals:
Site Plan approved by the PC - 2/21/2017;  Site Plan approved by the DRC - 5/09/2017 


Landscape Site Plan_KrogerSHOPS
The Shops at Arlington Village
(Airline Road PD, Phase 1) 
 Status: Site work Completed
Location: Southeast corner of Airline Road and Milton Wilson
Applicant/Developer: Shops Dev, LLC
Engineer/Designer: Cara Martin, Pickering Firm, Inc.

 A Master Development Plan for Phase 1 of the Airline Road PD on a 24-acre parcel, also known as the Shops at Arlington Village.  The proposal included a 123,000 square foot Kroger Marketplace with a drive-thru pharmacy, click list area, and fuel center.  A multi-tenant shopping center and four (4) outparcels are also proposed for the site.    
More information regarding the site can be found by visiting the SHOP Companies website at http://shopcompanies.com/.
 

 Approvals: 
The Shops at Arlington Site Plan and the Kroger Site Plan approved by the DRC on 03/08/2016
Master Development Plan approved by the PC on 02/16/2016 and by the BMA on 02/22/2016
Amendment to the PD (Rezoning) approved by the BMA on on 01/04/2016
Amendment to the PD (Rezoning), Final Plat, and Site Plan approved by the PC on 12/20/2015


(Back to Top)


Residential Projects
   
Note: All images shown on this page are conceptual and may not depict the final product.


WilsonLake Site Plan_Concept
Wilson Lake PD, Master Plan

Status: In Process
Location: North side of Forrest Street, east of Forrest Street Park
Applicant/Developer: Creekside Homes, LLC
Design Professional: The Bray Firm

Proposed Master Plan for a Residential Planned Development (PD) on 38.4 acres of vacant residential land on the north side of Forrest Street. The proposal includes 60 detached single-family homes and 17.11 acres of Common Open Space .
  
Approvals
Master Plan to recommended for approval by PC on 02/19/2019
Master Plan to be considered by BMA on 06/03/19


VillageDonelsonFarms_Site COS Plan - Copy
Village at Donelson Farm PD amendment
Status: In Process
Location: South side of Donelson Farms Parkway, across from Donelson Elementary
Applicant/Developer: City Enterprises
Design Professional: SR Consulting, LLC

A proposed amendment to an approved Master Plan for a Residential Planned Development (approved by BMA in 2017) to incoporate additional land west of the initial PD.  Proposal includes 32 new single-family homes and associated common open space amenities on approximately 13.2 acrs of undeveloped property.
  
Approvals
Master Plan amendment recommended by PC on 05/20/2019; approved by BMA on 08/05/19
Construction Plans approved by PC on 05/18/20


Location Map_White Oak Phases - Copy
Village at White Oak 1st Addition - Phases 5, 14, and 19
Status: Ph 5 Under Construction; Phases 14 & 19 In Process
Location: west side of Milton Wilson, between Kensington PD and original White Oak neighborhood
Applicant/Developer: Arlington Investors Group, LLC
Design Professional: McGuire Engineering

Plans for constrution of public improvements in 3 additional phases of the approved Master Plan for the Villages at White Oak 1st Addition.
  
Approvals
Constrution Plans for Ph 5 approved by PC on 05/20/2019
Construction Plans for Ph 14 & 19 to be considered by PC on 05/20/19



Myers Park_website
Myer's Park PD, Master Plan
Status: Phase 1 Under Construction
Location: Northwest corner of Memphis-Arlington Rd and Gerber Rd
Applicant/Developer: RDKK Holdings, LLC
Design Professional: Dalhoff Thomas Design Studio

Proposed Master Plan for a Mixed Use Planned Development on 38.5 acres of Industrial land at Memphis-Arlington and Gerber Rd. The proposal includes primarily detached single-family homes, with 9 acres of Common Open Space and a small Mixed Use center fronting Memphis-Arlington with neighborhood-serving retail, office, and residential lofts.
  
Approvals
Master Plan considered and not recommended by PC on 08/20/2018
Master Plan considered by BMA on 09/04/2018, and approved on 10/01/2018


FL Ph2_Plat - Copy (2)

Forrest Lake PD, Phase 2
Status: Completed. Homes Under Construction.
Location: North of Forrest Street, West of the Cambridge development and East of Wilsons Crossing PD
Applicant/Developer: Creekside Homes, LLC
Engineer: The Bray Firm. 

Phase 2 of the Forrest Lake PD will continue construction of the Forrest Lake Planned Development (PD), which was originally approved in 2015.  These next phase consists of 38 single-family residential lots and are located immeditaely north of Phase 1 (currently under construction).   
  
Approvals
Common Open Space plans approved by DRC on 10/10/2017
Construction Plans and Plat approved by PC on 07/17/17 and 08/21/2017


Belmont Site Plan_PH 2 and 3

Belmont PD, Phases 2 and 3
Status: Phase 2 Complete. Phase 3 Under Construction
Location: North of Forrest Street, East of the Cambridge development, west of the Shelby/Fayette County line
Applicant/Developer: Belmont, LLC
Engineer: Consulting Engineering Services, Inc. 

Phases 2 and 3 of the Belmont PD will continue construction of the Belmont Planned Development (PD), which was originally approved in 2015.  These next phases consist of 58 single-family residential lots (27 in Phase 2 and 31 in Phase 3) and are located immeditaely north of Phase 1 (currently under construction).   
  
Approvals
Common Open Space plans approved by DRC on 02/09/2016
Construction Plans and Plat approved by PC on 05/15/2017



WilsonsCrossing Ph3_4 Landscape Clean
Wilson's Crossing PD, Phase 3 and 4
Status: Completed. Homes Under Construction.
Location: East of Milton Wilson, north of Caymus Lane in Phase 2 of Wilson's Crossing
Applicant/Developer: Wilson's Crossing Partners, LLC
Engineer:


Phases 3 and 4 of the Wilson's Crossing PD consists of 70 single-family residential lots and 2 common open space areas.  
  
Approvals
Common Open Space plans approved by DRC on 04/11/2017
Construction Plans and Plat approved by PC on 03/20/2017



 
(Back to Top)

 

Planning and Development

Areas of
Interest

SEE FULL MAP