Current Projects

Request email notification when page changes E-Notify

Commercial Projects
Note: All images shown on this page are conceptual and may not depict the final product.
 


Rendering Pic
Greenlee Street Offices

 StatusIn Process
Location:  Northwest corner of Greenlee St. and Mott Street

Applicant/Developer: Meridian Properties, Bart Thomas
Engineer/Designer: The Renaissance Group, Wesley Wooldridge


A request to build  two, single-story,  6,375 square foot office buildings on a 1.26-acre site. 

Approvals:

Site Plan approved by PC on 9/18/2017
Site Plan approved by the DRC on 10/10/2017

North Elevation_revised
Brendalay Grill
 StatusIn Process
Location:  6359 Quintard Street

Applicant/Developer: Deven Patel (owner)
Engineer/Designer: Jeff Blackledge Architecture, The Bray Firm


A request to build a two-story, roughly 8,000 square foot sit-down restaurant with an apartment upstairs on a 2.2-acre site. 

Approvals:

Site Plan approved by PC on 9/18/2017
Site Plan approved by the DRC on 10/10/2017

C-store Rendering Pic
C-Store Airline & 64

 StatusIn Process
Location:  Northwest corner of Airline Road and Highway 64

Applicant/Developer: N&S, LLC, Nizar Lalani
Engineer/Designer: McCarty Granberry Engineering, John McCarty


A request to build a single-story, roughly 5,000 square foot convenience store with fuel and retail space on a 3.8-acre site. 

Approvals:

Site Plan approved by PC on 9/18/2017
Site Plan approved by the DRC on 10/10/2017

ArlingtonAbbey_Pic
Arlington Abbey

 Status: Withdrawn
Location:  6183 Quintard Street

Applicant/Developer: Vicki and Dickie Parker (owner)
Engineer/Designer: Bll Fuller, architect


A request for a Conditional Use Permit to renovate an existing church building built in 1871, for use as a wedding chapel and meeting hall for other events.

Approvals:
Site Plan recommended for approved by PC on 9/18/2017
CUP Application to BZA - WITHDRAWN

Presentation1
Steamfitters Renovation
 StatusIn Process
Location:  5670 Commander Drive

Applicant/Developer: Steamfitters Local Union 614
Engineer/Designer: 
Ledford Engineering


A request to convert an existing manufcaturing site into office and educational space for the applicant's use, including renovation of the exising building and the addition of parking and landscaping to the 2.18-acre site. 

Approvals:

Site Plan approved by the PC on 7/17/2017
Site Plan approved by the DRC - 8/8/2017

OrthoOne elevation2

Ortho One
 Status: Under Construction
Location:  Southwest corner of Airline Road and Will Harris 
Applicant/Developer: DPL Holdings
Engineer/Designer: Ledford Engineering Architecture and Planning

A request for a single-story, approximately 5,200 square foot ortho office on the 1.26 acre lot. 

Approvals
:

Site Plan approved by the PC on 3/20/2017
Site Plan approved by the DRC - 4/11/2017 


RedMed Champion Elevation_sm
RedMed and Champion Orthopedics
 Status: Under Construction (RedMed)
Location:  West side of Airline  Road, 950 feet north of Milton Wilson Blvd.
Applicant/Developer: Carlson Consulting Engineers

A request for two single-story medical office buildings, one roughly 4,600 square foot urgent care and one roughly 5,600 square foot orthopedic office, on a 2.56 acre commercial lot. 

Approvals:
Site Plan approved by the PC on 5/15/2017
Site Plan approved by the DRC - 6/13/2017 

OReilly site plan

O'Reilly Auto Parts
 StatusApproved
Location:  West side of Airline Road, north of Milton Wilson and adjacent to new dermatology clinic.
Applicant/Developer: The Hutton Company
Engineer/Designer: Wolverton & Associates

A request for a single-story, approximately 7,500 square foot O'Reilly Auto Parts store on the 1.3 acre lot. 

Approvals:
Site Plan approved by the PC on 2/21/2017
Site Plan approved by the DRC - 3/14/2017 


ArlCC Storage_rendering - Copy

Arlington Climate Controlled Storage

 Status:Under Construction
Location
6001 Airline Road (previously Grisham Brothers Corp.)
Applicant/Developer: Arlington Investments
Engineer/Designer: Ledford Engineering and Roy Scobey, Architect

A request to convert an existing manufacturing site on 5.33 acres into commercial uses, including indoor climate controlled storage and indoor athletic/fitness.

Approvals:
Site Plan approved by the PC - 3/20/2017
Site Plan approved by the DRC - 4/11/2017 


DepotSquare_Rendering pic

Arlington Depot Square Project
 Status: In process
Location:  
Northwest corner of Walker Street and Quintard
Applicant/Developer: Cotton Gin Joint Venture
Engineer/Designer: Renaissance Group, Inc. 

A request to construct a two-story, approximately 12,800 square foot retail/office building on the southeast corner of the parcel with associated parking. 

Approvals:
Site Plan approved by the PC - 2/21/2017
Site Plan approved by the DRC - 5/09/2017 



Front Rendering
Olympic Steak and Pizza

 Status:
Under Construction
Location: Northwest corner of Airline Rd and Will Harris St.
Applicant/Developer:
Olympic Steak and Pizza
Engineer/Designer:
Don Cole Engineering

A request for a single-story, approximately 7,200 square foot sit down restaurant .
Approvals:
Site Plan approved by the PC on 11/21/2016
Site Plan approved by the DRC on 3/14/2017 


Rendering_Atown
A-Town Crossfit
 Status: 
Approved
Location:  Hwy 70, east of Greenlee St.,  adjacent to Trustmark Bank
Applicant/Developer: 
A-Town Crossfit
Engineer/Designer: 
Renaissance Group


A request for a two-story building on the approximately 1 acre parcel, with 6,000 square feet of commercial gym on the  1st Floor and a 3,000 square feet of residence above on the 2nd floor. 

Approvals:
Site Plan approved by the PC on 1/17/2017
Site Plan approved by the DRC - 2/13/2017 


Materials Colors_Airline Shops
Shops of Airline
 Status: Under Construction
Location:  Northwest corner of Airline Road and Otto Lane
Applicant/Developer: 
Marty Mathews (owner)
Engineer/Designer: 
Vertu Design Studio


A request for a single-story, approximately 4,175 square foot, 3-bay retail building, to include a Little Caesar's Pizza in one space.

Approvals:
Site Plan approved by the PC on 12/19/2016
Site Plan approved by the DRC on 02/13/2017  


Landscape Site Plan_KrogerSHOPS
The Shops at Arlington Village
(Airline Road PD, Phase 1) 
 Status: Under Construction
Location: Southeast corner of Airline Road and Milton Wilson
Applicant/Developer: Shops Dev, LLC
Engineer/Designer: Cara Martin, Pickering Firm, Inc.

 A Master Development Plan for Phase 1 of the Airline Road PD on a 24-acre parcel, also known as the Shops at Arlington Village.  The proposal included a 123,000 square foot Kroger Marketplace with a drive-thru pharmacy, click list area, and fuel center.  A multi-tenant shopping center and four (4) outparcels are also proposed for the site.    
More information regarding the site can be found by visiting the SHOP Companies website at http://shopcompanies.com/.
 

 Approvals: 
The Shops at Arlington Site Plan and the Kroger Site Plan approved by the DRC on 03/08/2016
Master Development Plan approved by the PC on 02/16/2016 and by the BMA on 02/22/2016
Amendment to the PD (Rezoning) approved by the BMA on on 01/04/2016
Amendment to the PD (Rezoning), Final Plat, and Site Plan approved by the PC on 12/20/2015



Residential Projects
   
Note: All images shown on this page are conceptual and may not depict the final product.



FL Ph2_Plat - Copy (2)

Forrest Lake PD, Phase 2
Status: Approved
Location: North of Forrest Street, West of the Cambridge development and East of Wilsons Crossing PD
Applicant/Developer: Creekside Homes, LLC
Engineer: The Bray Firm. 

Phase 2 of the Forrest Lake PD will continue construction of the Forrest Lake Planned Development (PD), which was originally approved in 2015.  These next phase consists of 38 single-family residential lots and are located immeditaely north of Phase 1 (currrently under construction).   
  
Approvals
Common Open Space plans approved by DRC on 10/10/2017
Construction Plans and Plat approved by PC on 07/17/17 and 08/21/2017


Belmont Site Plan_PH 2 and 3

Belmont PD, Phases 2 and 3
Status: Under Construction
Location: North of Forrest Street, East of the Cambridge development, west of the Shelby/Fayette County line
Applicant/Developer: Belmont, LLC
Engineer: Consulting Engineering Services, Inc. 

Phases 2 and 3 of the Belmont PD will continue construction of the Belmont Planned Development (PD), which was originally approved in 2015.  These next phases consist of 58 single-family residential lots (27 in Phase 2 and 31 in Phase 3) and are located immeditaely north of Phase 1 (currrently under construction).   
  
Approvals
Common Open Space plans approved by DRC on 02/09/2016
Construction Plans and Plat approved by PC on 05/15/2017



WilsonsCrossing Ph3_4 Landscape Clean
Wilson's Crossing PD, Phase 3 and 4
Status: Under Construction (Phase 4)
Location: East of Milton Wilson, north of Caymus Lane in Phase 2 of Wilson's Crossing
Applicant/Developer: Wilson's Crossing Partners, LLC
Engineer:


Phases 3 and 4 of the Wilson's Crossing PD consists of 70 single-family residential lots and 2 common open space areas.  
  
Approvals
Common Open Space plans approved by DRC on 04/11/2017
Construction Plans and Plat approved by PC on 03/20/2017



White Oak Ph 1 2
The Villages at White Oak PD, 1st Addition - Phase 1A & 1B
Status: Under Construction
Location: on the east side of Milton Wilson, south of the Kensington PD
Applicant/Developer: Keith Grant, Arlington Investors Group, LLC
Design Professional: Fisher Arnold
 
  Phase 1A of the Villages at White Oak consists of 32  single-family lots and 3 open space lots. Lots in Phase 1A will have homes with minimum heated s.f. ranging from 2,450 to 2,700. Phase 1B is also located on the east side of Milton Wilson, adjacent to the Villages at White Oak PD, and includes 36 single-family lots and 2 open space lots.   Lots in Phase 1B will have homes with a minimum heated s.f. of 2,250.
For more information regarding these phases, please see the attached booklet.
 
Approvals:
Master Development Plan approved by the PC on 07/18/16 and the BMA on 08/01/16
General Development Plan approved by the PC on 12/20/15 and by the BMA on 02/01/16


Wilsons Crossing DRC
Wilson's Crossing PD, Phase 2

Status: Under Construction
Location: East of Milton Wilson, north of Forrest Street

Applicant/Developer: Wilson's Crossing Partners, LLC
Engineer: W.H. Porter
  
Phase 2 of the Wilson's Crossing PD consists of 41 single-family residential lots and 2 common open space areas - one being utilized for a community pool.  
  
Approvals: 
Development Agreement with the applicant approved by BMA on 02/01/2015
Construction Plans and Final Plat approved by PC on 12/20/2015
Site Plan approved by DRC on 11/10/2015


belmont pd
Belmont PD, Phase 1
Status: Under Construction
Location: On the north side of Forrest St, east of the Cambridge Manor PD, and west of the Shelby/Fayette County line
Applicant/Developer: David Goodwin, Payne Lane Development, LLC
Engineer: Mohammed Bajhaipour, CES, Inc.
  
A request for Phase 1 of the Belmont PD located .  Phase 1 will span 19.76-acres and will consist of 2.65 acres of common open space and 37 single-family residential lots.   
 
Approvals: 
Site Plan approved by DRC on 02/09/2016
Construction Plans and Final Plat approved by PC on 10/19/2015

 

 